Call Now: (248) 900-1722
    Compacted gravel pad foundation prepared for a shed

    Getting a Shed? Start With a Solid Foundation.

    A shed is only as stable as the foundation underneath it. We build properly sized, reinforced, and compacted gravel pads that create a level, well-drained base before your shed arrives.

    Serving Howell • Royal Oak • Beverly Hills

    Why Your Shed Needs a Gravel Pad

    Your shed may look solid above ground, but the foundation underneath it plays a major role in how well it performs over time.

    Placing a shed directly on unprepared soil can lead to uneven settling, poor drainage, moisture underneath the structure, and a shed that gradually shifts out of level.

    A properly installed gravel pad creates a stable, compacted base before the shed arrives. It helps distribute the weight of the structure, improves drainage around the shed, and gives the installer a level surface to work from.

    Our gravel pads are sized beyond the shed footprint to provide the support and surrounding space the foundation needs.

    • 8×8 shed → 10×10 gravel pad
    • 10×14 shed → 12×16 gravel pad

    How We Build Your Gravel Pad

    1

    Size the Pad

    We determine the correct gravel pad size based on your shed dimensions and prepare a foundation that extends beyond the shed footprint.

    2

    Frame & Secure

    We build the perimeter using pressure-treated skids and secure the frame with 1/2-inch rebar driven into the ground.

    3

    Clear & Grade

    We remove sod, soil, roots, rocks, and debris from inside the framed area, then grade and level the site.

    4

    Add Stone, Level & Compact

    We fill the frame with 21A limestone, level the material, and mechanically compact it to create a stable gravel shed foundation.

    What's Included in Your Gravel Pad Installation

    Every gravel pad installation includes the materials, site preparation, equipment, and labor needed to prepare a stable foundation for your shed. Before work begins, we confirm your shed size and site conditions so the gravel pad can be properly prepared for the installation.

    Pressure-Treated Skids

    4x6x12 weather-treated wood skids framed around the full perimeter of the pad.

    1/2-Inch Rebar & Fasteners

    Rebar stakes driven through the skids plus structural fasteners and hex screws to lock the frame in place.

    Site Prep & Debris Removal

    Sod, soil, roots, rocks, and debris cleared out from inside the frame, then graded and leveled.

    21A Limestone Gravel

    21A limestone delivered and spread inside the frame at roughly 4 inches of compacted depth.

    Mechanical Compaction

    Plate compactor run over the stone so the base is solid and ready for the shed installer.

    Labor & Haul-Away

    All installation labor, truck drive time and fuel, and disposal of the excess soil and debris.

    Gravel Pad Installation Near You

    A&B Junk Removal provides professional gravel pad installation for homeowners served through our Howell, Royal Oak, and Beverly Hills locations.

    Whether you're preparing for a new shed or replacing an unstable base, we can handle the site preparation, framing, limestone, leveling, and compaction needed to create a solid shed foundation.

    Howell

    2255 Walnut View Dr, Howell, MI

    Royal Oak

    2020 Bellaire Ave, Royal Oak, MI

    Beverly Hills

    31119 Greenfield Rd, Beverly Hills, MI

    Gravel Pad Installation FAQs

    Ready for Your Shed? Start With the Right Foundation.

    Tell us your shed size and where it will be installed, and we'll help you prepare the right gravel foundation for the job.

    Serving Howell • Royal Oak • Beverly Hills